見る
見る

横型マシニングセンタMAKINO A81

Ohio, アメリカ合衆国

概要

ブランド
モデル
ID
593936
条件
使用 - リビルト
場所
Ohio
アメリカ合衆国
在庫No.
DT-006
詳細
 Spindle CAT50 Tapper 10K RPM  Factory Rebuild Spindle Details (Using OEM replacement parts) • 1 year warranty through Makino • Clamp & Unclamp switches replaced • All cabling on switches replaced • Rear Rotary Union for the TSC is replaced • TSC/Nozzle coolant (all hoses replaced)  X-AXIS  Replace Ball Screw & LM Guides  Replaced over travel & reference switches, as well as cabling for limit switches  Y-AXIS  Replace Ball Screw & LM Guides  Inspect LM guides (If they do not meet factory specification then we will replace with OEM factory parts)  Replaced over travel & reference switches, as well as cabling for those limit switches  Z-AXIS  Replace Ball Screw & LM Guides  Replace over travel & reference switches, as well as cabling for those limit switches  Pallet Changer  Replaced all hoses  Replaced all limit switches  Replaced all proximity switches  Replaced all cabling to limit & proximity switches  Replaced all seals  Replaced all O-rings  Replace all CAM followers  Replaced all brass guides  This is a complete pallet change rebuild back to factory specification with OEM parts  Index Table (1 Degree 4th)  Replace the following… • Support roller bearing • All O-rings • All D-rings, • Roto glide rings • Back up rings • Seals • Vertical and Horizonal gears and shafts (Match Set) • Three-piece curvature coupling (Match Set) • Table oil • WILL INSPECT the Clamp and Unclamp piston (Includes the Center Post) (REPLACE IF NEEDED)  This is a complete rebuild of the Index table back to OEM factory Specification  4 Table Cones • O-Rings • Back-up Rings • Seals • Dust seals & springs • All steel balls  ATC Arm  Replace with new style tool changer arm (removable tool arm sleeves)  Replace tool arm fingers • Finger body • Spring • Roller Shaft • Bearings • Thumbs will be ground to factory spec  Rebuilt the ATC motors  Replace all belts  Inspect gear box for damage, non was found  Replace oil  Replace sight glass & seals  Replaced ATC door  Replace ATC all moving parts for the door  Replace proximity switches for ATC door open and close  Replace door guides  Sub Arm  Replace grippers  Replace bearings  Replace hydraulic seals/O-rings  Replace all backup rings  Replace bushings  Replace proximity & limit switches and Cables for those switches  Replace pot clamping spring  Replace any part that does not meet factory specification with OEM Parts  Magazine (60 pots)  Will include all required tool pots  Inspected support bearings for Tool Ring will replace if needed with OEM part  Tool Ring • Replace all hoses • Replace all limit/Reference switch • Replace all proximity switches • Replace all cabling to limit & proximity switches • Inspect pots and replace if needed • Replace the chain for the Tool Ring • Clean and replace the numbers for the tool pots on the Tool Ring • Inspected and replace if needed the Tool Pot Clips on the Tool Ring • Replace belts  Rebuild hydraulic cylinder  Inspect and replace if needed the servo motor for Tool Ring  Replaced the Tool Magazine Operator Door glass  Hydraulic & Pneumatic Piping/Filters  Replace all hoses for the entire machine  Replace any damaged or worn air lines  Replace all air filters  Replace all air bowls  Replace hydraulic filters  Inspect all hydraulic valves & will replace with factory OEM parts as needed  Inspect all air valves & will replace with factory OEM parts as needed  Rebuilt the main hydraulic unit motor  Replace main hydraulic pump with a new OEM spec pump  Clean & inspect main machine hydraulic unit  Spindle Oil Temperature Controller (Chiller)  Replace all hoses  Replace filters  Clean tank  Clean & inspected radiator on unit (repair if needed)  Fix & repaired sheet metal on unit & repaint to factory specification  Make sure the unit is working properly  Coolant Tank  Coolant system is Brand New  1000 PSI Through The Spindle Coolant (Chip Blaster) is also Brand New  Shower Coolant  Replace all hoses  Replace all lines feeding the shower coolant nozzles inside work envelope also replaced  Shower Coolant system is built back to factory working specification  Splash Guard  Replace X-Axis wipers  Inspect X-Axis cover for damage & repair/replace if needed  Inspect Y-Axis Cover for damage & repair/replace if needed  Replace Z-Axis wipers  Replace operator door glass and seals  Replace operator door rollers  Replace Automatic Pallet Changer (APC) windows and seals  Replace overhead window and seals  Replace overhead light with LED  Complete leak test of machine to ensure there are no leaks and that the entire coolant system works to factory specification  Safety  Ensured that all E-Stops work for entire machine & coolant system  Ensured that all over travel switches work properly  Ensured that all door interlock switches work properly  Options  Auto-lube System  We will Add Auto Lube to the machine. That option was not on the machine.  Ensured that all axis’ are greased & lubricated properly by unit (to factory specification)  Cosmetic  Repaired all sheet metal blemishes  Painted the machine and coolant system back to factory colors  Replaced all safety stickers back to OEM specification  Machine looks just as it was when it was new  Warranty requirements  12-month warranty on spindle through Makino  Downtime Rebuild provides 12-month warranty on machine including control, drives, servo motors.  Machine must be installed by a certified Downtime Rebuild Service Engineer to ensure the 24- month warranty (*All install costs are Included in the machine price). If you decline the install by a certified Downtime Service Engineer then the machine is then considered “As-is” “Where is” (No warranty).  Downtime Extras that are included with the Rebuilt Machine  Will de-install and pack the rebuilt machine at Downtime Rebuild for shipment to customer’s facility.  We will load the rebuilt machine onto truck for shipment to customer’s facility.  Installation of rebuilt machine at customer’s facility by a certified Downtime Rebuild Service Engineer. * MACHINE IS CURRENTLY BEING REBUILT. *
スペック
メトリックに仕様を変換します
X35.4"
Y31.5"
Z35.4"
パワー40 hp
回転数10,000 RPM
#ATC60
パレット-幅24.764"
パレット-長さ24.764"
テーパーCAT50
#Axis4
管理CNC (Fanuc)

装備

New Spindle From Makino with a One (1) year warranty, The Entire machine comes with a Two (2) Year warranty. That also includes all the Fanuc components. The Auto Lube, Band New Coolant system, Brand New Chip Blaster Unit (1000 PSI TSC), - Two (2) additional pallets plus the two that come with the machine.
売り手について
価格
$200,000.00 USD

$200,000.00 USD

このタイプのリストを参照してください

thumb

TOSHIBA BMC-100

横型マシニングセンタ

台湾
thumb

HITACHI SEIKI HC-630

横型マシニングセンタ

台湾
thumb

HITACHI SEIKI HC500

横型マシニングセンタ

台湾
thumb

MACHINING SYSTEMS HMC-100

横型マシニングセンタ

新しい在庫がある | Michigan, アメリカ合衆国
すべてを表示

このブランドのためのより多くのリストを参照してください

thumb

MAKINO A55

横型マシニングセンタ

台湾
thumb

MAKINO EC-3040

ワイヤーEDM

台湾
thumb

MAKINO EC-7050

ワイヤーEDM

台湾
thumb

MAKINO MCC2513

横型マシニングセンタ

使用 - 優れました | 2005 | Tokyo, 日本
すべてを表示